View Single Post
Old 17-12-2023, 01:07 PM   #82
kevino
FF.Com.Au Hardcore
 
Join Date: Dec 2009
Posts: 3,306
Default Re: The railway thread

Quote:
Originally Posted by roKWiz View Post
Disgusting, NSW govco closing that line down, there was quite a good amount of regular travellers using the XPT on the Murwullimbah section.

As long as the lines are still down, they can not sell or remove any track along a 100ft rail corridor.

The railtrails throughout Victoria ave been built on top of existing rail, so they can be re-converted back to heavy rail at any time.
There was good passenger loads
But the only freight left was a short train out of Condong Sugar Mill with fly ash which I think is used in cement making


The line from Murwullimbah to Condong is a mess sections removed wash outs.

I guess a long line from Casino to Murbah needs freight as well as passengers to survive financially
kevino is offline   Reply With Quote